News

What are the preparations before using the horizontal tensile testing machine

The horizontal tensile testing machine usually adopts the welded structure of the overall steel plate of the frame, which can adjust the tensile space level by level according to the specification and length of the sample. The loading mode of the test force is controlled by the computer, and the test data are processed automatically according to the requirements of the test method. The equipment is mainly used for the tensile load, damage and other tests of steel wire rope, anchor chain, hoisting belt, safety belt and other products. The equipment has the advantages of flexible and convenient operation, slow and stable loading, strong body bearing capacity and so on. So what are the preparations for the use of the horizontal tensile testing machine? Let's learn more about it!

The horizontal tensile testing machine is mainly used for tensile tests of metal bars, large pipe fittings, anchor cables (chains), steel wire ropes, etc. The high rigidity load frame is adopted, and the loading space of the testing machine is composed of high-strength cast steel workbench, four electroplating columns and two precision ball screws; It adopts synchronous toothed belt and ball screw pair transmission, imported servo AC motor and speed regulation system, which has the characteristics of no gap, no vibration, low noise, wide speed regulation range, high precision and large test space.

Preparation of horizontal tensile testing machine before use

1. Before starting the horizontal tensile testing machine, we must first check whether all parts are abnormal and whether the brake is normal and reliable.

2. Before the operation of the horizontal tensile testing machine, the workpiece must be placed stably and aligned before it can be started for operation.

3. The horizontal tensile testing machine shall not roll the workpiece beyond the specified range of mechanical properties of the bending machine.

4. When the horizontal tensile testing machine needs to make a workpiece that is not round enough, it is recommended to roll it to the end of the steel plate and reserve a certain space to prevent the workpiece from falling and hurting people.

5. Adjust the thickness of the coiler drum in strict accordance with the plate thickness to avoid overload operation.

6. Before starting up, check whether the coupling shield or belt shield is fixed properly.

Tags:
Prev:
Next:
X

Online Chat

Skype        Email me Mail to us